REPORT TO COUNCIL
SUBJECT
Title
Action on a Resolution Authorizing the Use of City Electric Forces for New Dark Fiber Installations at Various Locations; Determine the Proposed Actions Are Exempt From CEQA Pursuant to Sections 15302(c) and 15303 (d) of Title 14 of the California Code of Regulations
Report
COUNCIL PILLAR
Deliver and Enhance High Quality Efficient Services and Infrastructure
BACKGROUND
Charter Section 1310 titled “Contracts on Public Works” states, in part, “that every contract involving an expenditure of more than one thousand dollars ($1,000) for the construction or improvement (excluding maintenance and repair) of public buildings, works, streets, drains, sewers, utilities, parks and playgrounds shall be let to the lowest responsible bidder.” The section further states that “the City Council may declare and determine that, in its opinion, the work in question may be performed better or more economically by the City with its own employees, and after the adoption of a resolution to this effect by at least four affirmative votes, it may proceed to have said work done in the manner stated, without further observance of the provisions of this section.”
In 2014, Silicon Valley Power (SVP) developed a position called Fiber Splicing Technician as an in-house position to primarily perform maintenance and repairs to meet the fiber performance standards of then existing fiber customers, which includes City departments and commercial customers. Fiber Splicing Technician activities include basic splicing and distribution changes to fiber optic cables. The technician can also perform duties such as pulling, laying, aligning and positioning fiber optic equipment for new connections to the fiber network. Fiber Splicing Technicians perform fusion splicing at building entrances and in maintenance space. At this time, SVP employs two Fiber Splicing Technicians.
DISCUSSION
Currently, the SVP fiber optic network serves SVP, other City departments, and various commercial customers. As the work is specialized, the position of Fiber Splicer Technician performs a variety of activities from maintenance and repair to new or re-spliced interconnections to the SVP Fiber Enterprise. Each interconnection can be unique involving different hours of labor depending on the number of fibers required to be spliced and the particular location within the network. Technician time is tracked hourly and not on a per fiber basis.
Large or extensive projects involving extending fiber cable being laid along new paths or great distances or adding conduit or related infrastructure are done using a previously bid unit price public works contract with a private construction contractor. SVP spends up to $1 million per year on this public works contract for new Fiber network construction and certain maintenance and repair activities.
Staff believes that the Fiber Splicer Technician work that may be required in new construction projects is best and most efficiently performed with City forces based upon the following factors: (1) the work is limited in size and scope; (2) City forces have knowledge and training in operating and maintaining and repairing the fiber optic system that can be leveraged to more economically perform this work; and (3) bidding out the work and contracting with a private entity would not likely result in a lower overall cost or time savings. Therefore, staff recommends that the City Council make a finding that City forces can better perform the Fiber Splicing and related equipment installation, splicing and connections to the existing SVP fiber infrastructure and approve the use of City forces.
Estimate Number: FWM#01498
Location: 2421 Mission College Boulevard to 2972 Stender Way
Type of Service: New Business
Description of Work: Splice, terminate and test fibers for a new point to point route from 2421 Mission College Boulevard to 2972 Stender Way for a fiber lease customer.
Estimated Cost: $9,206
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#0285
Location: 3301 Bassett St (Storm SCADA)
Type of Service: Storm Drain
Description of Work: Splice, terminate and test fibers at 3301 Bassett Street for customer Storm Drain.
Estimated Cost: $7,114
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#1051
Location: Well 8 - 3095 Forbes Avenue (W&S SCADA)
Type of Service: Water Utility Infrastracture
Description of Work: Splice, terminate and test fibers at Well 8 for customer Water Department.
Estimated Cost: $5,082
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#1053
Location: Well 12 - 3277 San Juan Avenue (W&S SCADA)
Type of Service: Water Utility Infrastracture
Description of Work: Splice, terminate and test fibers at Well 12 for customer Water Department.
Estimated Cost: $5,082
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#0292
Location: 2900 Old Mountain View Alviso Road (Storm SCADA)
Type of Service: Storm Drain
Description of Work: Splice, terminate and test fibers at 2900 Old Mountain View Alviso Road for customer Storm Drain.
Estimated Cost: $5,082
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#1052
Location: Well 9 - 3330 Pruneridge Avenue (W&S SCADA)
Type of Service: Water Utility Infrastracture
Description of Work: Splice, terminate and test fibers at Well 9 for customer Water Department.
Estimated Cost: $5,082
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#1054
Location: Well 13 - 1098 Santa Clara Street (W&S SCADA)
Type of Service: Water Utility Infrastracture
Description of Work: Splice, terminate and test fibers at Well 13 for customer Water Department.
Estimated Cost: $5,082
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
Estimate Number: FWM#0997
Location: 3575 Victor Street (Storm SCADA)
Type of Service: Storm Drain
Description of Work: Splice, terminate and test fibers at 3575 Victor Street for customer Storm Drain.
Estimated Cost: $5,082
Appropriation: Electric Utility Capital Fund (591) Project 2004 - Fiber Development Design & Expansion
Source of Revenue: Developer Contribution
ENVIRONMENTAL REVIEW
Staff recommends that the City Council determine that the actions being considered are exempt from the California Environmental Quality Act (“CEQA”) pursuant to the following sections of Title 14 of the California Code of Regulations: (1) Section 15302(c) (Class 2 - Replacement or Reconstruction) as the proposed work involves the replacement or reconstruction of existing utility systems and/or facilities involving negligible expansion of capacity, and (2) Section 15303 (d) (Class 3 - New Construction or Conversion of Small Structures), because the proposed work involves the construction of a limited number of small fiber utility facilities.
FISCAL IMPACT
The funds to support the staff time for work performed by SVP and related construction materials for the work detailed in this report, totaling $46,812, are included in the Fiscal Year 2022/23 Capital Budget, Fiber Development, Design, and Expansion. All referenced work will be performed with City Electric Forces (SVP staff). Some work associated with encroachment permits may be performed by the Department of Public Works (DPW). DPW costs are recovered through payment of permit fees.
COORDINATION
This report has been coordinated with the Finance Department and City Attorney’s Office.
PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email clerk@santaclaraca.gov or at the public information desk at any City of Santa Clara public library.
RECOMMENDATION
Recommendation
Determine the proposed actions are exempt from CEQA pursuant to sections 15302(c) and 15303 (d) of Title 14 of the California Code of Regulations and adopt a Resolution authorizing the use of City Electric Forces for work detailed in this report located at 2421 Mission College Boulevard to 2972 Stender Way, 3301 Bassett Street (Storm SCADA), Well 8 - 3095 Forbes Avenue (W&S SCADA), Well 12 - 3277 San Juan Avenue (W&S SCADA), 2900 Old Mountain View Alviso Road (Storm SCADA), Well 9 - 3330 Pruneridge Avenue (W&S SCADA), Well 13 - 1098 Santa Clara Street (W&S SCADA), and 3575 Victor Street (Storm SCADA).
Staff
Reviewed by: Manuel Pineda, Chief Electric Utility Officer
Approved by: Office of the City Manager
ATTACHMENTS
1. Resolution - Use of City Electric Forces