Skip to main content
City of Santa Clara logo

Legislative Public Meetings

File #: 18-129    Version: 1 Name:
Type: Consent Calendar Status: Agenda Ready
File created: 2/12/2018 In control: Council and Authorities Concurrent Meeting
On agenda: 5/15/2018 Final action: 5/15/2018
Title: Accept Sewer Pump Station, Lift Station and Well Site Equipment Upgrades Project (WA 30305)
Attachments: 1. Notice of Completion

REPORT TO COUNCIL

SUBJECT

Title

Accept Sewer Pump Station, Lift Station and Well Site Equipment Upgrades Project (WA 30305)

 

Report

BACKGROUND

On March 8, 2016, Council awarded the Sewer Pump Station, Lift Station and Well Site Equipment Upgrades Project to Anderson Pacific Engineering Construction, Inc. for a not-to-exceed amount of $548,900.00. The Project included the replacement of the existing motor control centers (MCCs) and installation of new variable frequency drives (VFDs) at the Northside Sewer Pump Station and Rabello Sewer Pump Station; installation of new electrical utility services at the Northside Sewer Pump Station and Guadalupe Chart Recording Station; a new SCADA control panel equipment at Guadalupe Chart Recording Station; and new automatic transfer switches and controls at De La Cruz Sewer Lift Station and four groundwater water well sites.

 

The acceptance of a Project and filing of a Notice of Completion is one of the final steps in a public works project.  The attached Notice of Completion contains the required elements set forth in Civil Code § 8102.  Recording the Notice is authorized by statute, Civ. Code § 9204, and by recording the Notice within 15 days of acceptance, the City shortens certain statutes of limitations related to the Project, such as the time for filing mechanics liens and stop payment notices, thereby limiting the City’s potential liability.  Acceptance of the project will also allow for the release of retention payments to the contractor (Pub. Cont. Code §§ 7107(c)(2), 9203(a)).

DISCUSSION

All work in connection with the referenced Project has been completed in accordance with the Project plans and specifications and to the satisfaction of the City.

 

ENVIRONMENTAL REVIEW

The action being considered does not constitute a “project” within the meaning of the California Environmental Act (“CEQA”) pursuant to CEQA Guidelines section 15378(a) as it has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment. 

 

FISCAL IMPACT

There is no additional cost to the City other than staff time. 

 

COORDINATION

This report has been coordinated with the Finance Department and City Attorney’s Office.

 

 

 

PUBLIC CONTACT

Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside the City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email clerk@santaclaraca.gov <mailto:clerk@santaclaraca.gov> or at the public information desk at any City of Santa Clara public library.

 

RECOMMENDATION

Recommendation

Accept the work performed by Anderson Pacific Engineering Construction, Inc. for a final contract price of $548,900 for the Sewer Pump Station, Lift Station and Well Site Equipment Upgrades Project and authorize the City Manager to record the Notice of Completion with the County of Santa Clara Recorder.

 

Staff

Reviewed by: Gary Welling, Director, Water and Sewer Utilities
Approved by: Deanna J. Santana, City Manager

 

ATTACHMENT

1.                     Notice of Completion