REPORT TO DEVELOPMENT REVIEW HEARING
SUBJECT
Title
PUBLIC HEARING: Action on the Architectural Review (PLN25-00132) for a Proposed Manufacturing Building and Central Utility Building for Intel at 3065 Bowers Avenue. CEQA Status: Exempt per CEQA Section 15183.
Report
File No.(s): PLN25-00132
Location: 3065 Bowers Avenue, a 26-acre parcel located to the northeast corner of Central Expressway and Bowers Avenue, APN: 216-46-015; property is zoned High Intensity Office R&D (HO-RD).
Applicant: John Schwarz
Owner: Intel International
Request: Architectural Review for the development of a new manufacturing building (BW2) with an attached Central Utility Building (CUB2) to serve the planned manufacturing equipment. The buildings will be three-story structures and will have a total area of 101,971 square feet. The project will be constructed on an approximately 2.4-acre area on the southwest corner of the existing campus.
PROJECT DATA
The Project Data and Compliance Table is included as Attachment 2.
POINTS FOR CONSIDERATION
* The project site is an approximately 2.4-acre area of the southwestern corner of the 26-acre Intel Bowers Campus located at 3065 Bowers Avenue. This campus is a part of the Intel's manufacturing business.
* The project proposes to redevelop the approximately 2.4-acre portion of the Intel campus, which currently consists of paved surface parking and landscaped areas, with an up to 101,971-square foot manufacturing building (BW2), including an attached Central Utility Building (CUB2). The proposed building will be a three-story structure with maximum height of 101 feet and will have about 77,533 square feet of manufacturing space and 24,438 square feet of CUB2 space.
* The proposed BW2 will include manufacturing space, data servers, electrical and power facilities, and storage areas. The CUB2 portion will house a chiller area, pumps, cooling towers, piping, control equipment, and emergency generators. Intel plans to manufacture masks for pr...
Click here for full text