Action on Award of Contracts for As-Needed Engineering Support Services to Electric Power Engineers, LLC, Flynn Resource Consultants, Inc., Handran Engineering, Leidos Engineering, LLC, and Power-Tech Engineers, Inc. with an Aggregate Maximum Compensation Not-to-Exceed $15 Million, Inclusive of the Option Year, to be Funded from the Electric Utility Fund and the Electric Utility Capital Fund
Report
BACKGROUND
The City of Santa Clara's Electric Utility, Silicon Valley Power (SVP), has provided electric service for over 125 years and is experiencing significant continued growth. In response, SVP has developed a capital improvement strategy to address both near-term and long-term load growth.
On September 28, 2021 (RTC # 21-871), the City Council accepted SVP's Three-Year Growth Plan Strategy, which identified $300 million of proposed projects to install new facilities and replace aging infrastructure with higher capacity infrastructure. On November 15, 2022 (RTC # 22-1172), the City Council accepted SVP's System Expansion Plan for the California Independent Operator's (CAISO) Transmission Planning Process (TPP) FY2023/24.
The SVP System Expansion Plan anticipates a peak system load of 819 megawatts (MW) in 2025 and 1,306 MW by 2032. The plan identifies both near-term and ten-year improvements required to maintain electric service reliability in anticipation of the projected load growth. It also provides a technical basis for the analysis, including a summary of proposed projects.
To support the implementation of these initiatives, SVP requires engineering support services focused on system studies, planning, and operational reliability. These services provide technical expertise in the following areas:
* Transmission planning for real-time operations
* System enhancement and expansion transmission planning
* Project scheduling
* Communications engineering (wide area network)
* System operations business planning
* Commissioni...