REPORT TO BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE
SUBJECT
Title
Complete Streets Review for the 2026 Annual Street Maintenance and Rehabilitation Project (Chan)
Report
BACKGROUND
The Department of Public Works (DPW) is preparing the design for the 2026 Annual Street Maintenance and Rehabilitation Project (Attachment 1).
This project provides maintenance and rehabilitation treatments to maximize pavement life for various streets in the City. The project applies pavement treatments ranging from slurry seal, asphalt overlay, and full depth replacement. Staff coordinates with the BPAC to review and determine if the project streets have the potential for adding bicycle facilities as identified in the Santa Clara Bicycle Plan. It is important to note that if a street requires removal of parking or travel lanes due to limited right-of-way widths, the recommendations in the Bicycle Plan cannot be implemented without extensive public outreach, traffic analyses, and study.
At the March 2025 BPAC meeting, staff presented the list of streets to be included in the 2026 project. BPAC voted to approve the proposed bicycle facilities for the streets listed below:
1. Cabrillo Avenue (Calabazas Blvd. to Francis Ave.) - Class IIB Bicycle Lane
2. Camino Drive (Washington St. to Park Ave.) - Class III Bicycle Route
3. Garrity Way (Agnew Rd. to Lick Mill Blvd.) - Class III Bicycle Route
4. East River Parkway (Garrity Wy. to Lick Mill Blvd.) - Class III Bicycle Route
As set forth by the City of Santa Clara Complete Streets Policy, relevant transportation projects shall be coordinated with the BPAC to gather comments and recommendations regarding Complete Streets features that should be incorporated into the project.
DISCUSSION
The 2026 Annual Street Maintenance and Rehabilitation Project is currently at the 65 percent design phase. These projects are considered relevant transportation projects to be coordinated with BPAC, and as such, these plans are attached for BPAC to revie...