File #: 20-535    Version: 1 Name:
Type: Consent Calendar Status: Agenda Ready
File created: 5/6/2020 In control: City Council and Authorities Concurrent
On agenda: 8/25/2020 Final action:
Title: Public Hearing: Action on a Tentative Parcel Map for 2305 Mission College Boulevard [Council Pillar: Promote and Enhance Economic, Housing, and Transportation Development]
Attachments: 1. Resolution Recommending Council Approval of the Tentative Parcel Map, 2. Conditions of Tentative Parcel Map Approval, 3. Tentative Parcel Map, 4. Resolution No. 20-8883.pdf
REPORT TO COUNCIL

SUBJECT
Title
Public Hearing: Action on a Tentative Parcel Map for 2305 Mission College Boulevard [Council Pillar: Promote and Enhance Economic, Housing, and Transportation Development]

Report
BACKGROUND
The applicant is requesting approval of a Tentative Parcel Map (PLN2019-14217) to subdivide an existing 15.78-acre property into two parcels at 2305 Mission College Boulevard to facilitate redevelopment of the site. As stated in 17.05.400(e) of the City Code, consideration and action on a Tentative Parcel Map is a function of the City Council. Planning Commission recommendation is not required for minor subdivisions of four lots or less.

The existing property is developed with a 225,503 square foot, two-story office building, surface parking lots and site landscaping. An Architectural Review application to demolish the existing buildings and site improvements was filed by the applicant along with the Tentative Parcel Map proposal to construct two, three-story data center buildings totaling 489,951 square feet; a substation with a generation capacity of up to 78.1 megawatts (MW); and associated parking, site access and landscaping on the project site (Mission College Data Center Project). The Architectural Review application for the Mission College Data Center Project was approved at a public noticed Development Review Hearing on August 20, 2020 and included project conditions of approval.

The proposal is to create two separate lots composed of Lot 1 at 8.75 acres and Lot 2 at 7.04 acres for phased development of the two buildings designed for use as data centers. Building A totals 278,526 square feet and is proposed for construction on Lot 1 in Phase 1. Building B is 211,425 square feet and is proposed on Lot 2 in Phase 2. Each parcel is designed to have shared access to Agnew Road and Mission College Boulevard, and site circulation and parking; with utility service provided separately to each parcel.

DISCUSSION
Tentative Parce...