City of Santa Clara logo

Legislative Public Meetings

File #: 20-720    Version: 1 Name:
Type: Consent Calendar Status: Agenda Ready
File created: 7/31/2020 In control: Council and Authorities Concurrent Meeting
On agenda: 11/17/2020 Final action: 11/17/2020
Title: Action on an Agreement with Mott MacDonald, Inc. for Design Professional Services for the Lafayette St. Underpass at Subway Pump Station and Related Budget Amendment
Attachments: 1. Project Location Map, 2. Agreement
REPORT TO COUNCIL
SUBJECT
Title
Action on an Agreement with Mott MacDonald, Inc. for Design Professional Services for the Lafayette St. Underpass at Subway Pump Station and Related Budget Amendment

Report

COUNCIL PILLAR
Deliver and Enhance High Quality Efficient Services and Infrastructure

BACKGROUND
The Lafayette St. underpass at the railroad tracks south of Reed Street was constructed in 1936 to provide continuous pedestrian, vehicular, and Caltrain mobility on and above Lafayette Street (Attachment 1). The Lafayette Subway Storm Drain Pump Station (SWPS) was also constructed along with the underpass to collect and pump stormwater runoff from the railway underpass, nearby residential homes and small businesses. Over the last 10 years, the City has experienced constant ponding of water on the roadway surface at the Lafayette Street underpass. Staff has investigated this issue and determined that there is no simple maintenance solution, so it is necessary to hire a design professional to further investigate the problem and provide options for a solution.

The goal of the Lafayette St. Underpass at Subway Pump Station (Project) is to assess, evaluate and recommend improvements for the constant ponding of groundwater through investigating the existing roadway, drainage systems, and the SWPS. The consultant will conduct the necessary field investigations and analysis in order to prepare reports that assess this infrastructure. This includes recommending improvements to address the constant ponding of water on the roadway and improvements to the SWPS. The reports will be used as the basis for the next phases of the project which include design and construction. The design and construction phases of the project are currently not included in the budget.

DISCUSSION
A formal selection process was utilized to solicit proposals from consultants to provide the required design professional services. In July 2020, a Request for Proposals (RFP) was issued to solicit...

Click here for full text